This project primarily consisted of the replacement of all HVAC equipment on campus, replacement of the campus phone and intercom system, replacement of the casework, and replacement of selective floor and base finishes. In conjunction with the major scopes of work, a majority of the walls were painted on campus as well. After observing existing moisture infiltration issues, the exterior walls were remediated and all exterior window and masonry caulking was replaced.