JE Dunn constructed a 25,000 square feet elevated, enclosed bridge structure for manufacturing line conveying equipment. The fully enclosed structural steel conveyance platform spans nearly 600 feet to connect two existing manufacturing buildings and was constructed in three phases. Construction took place on an occupied campus with active semi-truck and forklift traffic and adjacent to buildings housing 24/7 production lines. Careful planning and close coordination with the owner occurred months in advance to create a logistics plan that took construction space requirements and manufacturing production impact mitigation into consideration.