JE Dunn has been active on this Confidential Semiconductor Manufacturing Client’s campus for the past eight years.
Our team has helped this client adopt a new Design-Build (DB) contracting strategy with some GMP, Lump Sum, D-B, CM/ GC, and shared savings compensation. This has created a collaborative environment geared towards improved cost and schedule certainty. We engage our design partner along with key Trade Partners during the programming phase which enables the team to challenge the client’s traditional/historic project delivery model used.
We continuously evaluate project risk through collaborative discussion as well as weekly project indicators that include cost, schedule, safety, quality, and closeout data. These indicators provide a snapshot of “project health” and enable the team to focus on areas of concern.
JE Dunn has constructed cleanrooms, extensive mechanical, and electrical support systems, including chilled water, process and house vacuum, process gases, ultra pure water, waste systems, telecom, power, air systems, and general and corrosive exhaust to support new cleanroom spaces and process tools.