This project was an essential milestone for this confidential semiconductor client to meet production ramp targets. The project consisted of construction of a new building designed to house an 18K lb. hydrochloric acid gas trailer, all microelectronics grade purification systems, toxic gas monitoring systems, specialized scales, and fire protection systems. The project significantly enhanced safety by reducing technician exposure, while decreasing manufacturing tool downtime.