je dunn construction master logo

SLAC National Accelerator Laboratory Bay Area Program

JE Dunn has been on the SLAC Menlo Park campus since 2016 and has completed numerous projects including:

A design/build, 3,000 square foot cooling tower upgrade that included the partial removal of existing cooling towers, refurbish and re-support of cooling towers to remain, addition of two new package unit cooling towers and all associated structure, infrastructure, MEP, controls, and minor site work.

2,000 square foot build-out of a newly constructed university research and education building. The first portion of work included the fit out of four rooms to house electron microscopes. A controlled relative humidity room was also built to prepare samples for testing. The project also included a liquid nitrogen system.

1,000 square foot remodel of an existing laboratory. This included the rework of HVAC, utilities, humidification and process gas upgrades.

1,000 square foot laboratory renovation to replace existing heat exchanger system and associated cooling systems which supplies cooling water to the accelerator beamline.

Remodel and build-out of 57,000 square feet of research and education space to house electron microscopes. Work included the installation of liquid nitrogen infrastructure to support the new accelerator system.

Location
Menlo Park, CA
Client
SLAC National Accelerator Laboratory
Architect
Integrated Engineering Services / HDR Architecture / CAS Architects
Completion Date
August 2023
$29.4
Million
62,892
Square Feet

Related Content

Projects
Advanced Industries
Santa Clara
Confidential Client Systems Upgrade & Expansion Progressive Build Program
Confidential Client
Fremont, CA
Projects
Advanced Industries
Portland
Confidential Semiconductor Manufacturing Client
Progressive Build Projects
Confidential
Hillsboro, OR
Thought Leadership
Advanced Industries Industrial & Manufacturing Mission Critical
JE Dunn Announces Its Newly Formed Advanced Facilities Group
Paul Neidlein
Advanced Facilities Group President
June 2024
Thought Leadership
Advanced Industries
Santa Clara
Thrifted Water – How One Facility is Applying Simple Solutions to Make a Big Impact
Ben Kallen
Project Manager
May 2024
Projects
Advanced Industries
Santa Clara
Confidential Client Cleanroom
Confidential Client
Fremont, CA
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Data Center Project
Confidential Client
Santa Clara, CA
Thought Leadership
Advanced Industries
The CHIPS Act – Establishing a Contractor’s Role
Travis Noble
Vice President
Project Executive
August 2023
Thought Leadership
Design
Advanced Industries
Santa Clara
Building Trust as a Designer: The Benefits of JE Dunn’s Design Management Services
Bob Spendle
Senior Design Manager
June 2023
Projects
Advanced Industries
Portland
Confidential Semiconductor Client
Fab Cleanroom Expansion & CUP Upgrades – Boise
Confidential
Boise, ID
Projects
Advanced Industries
Austin
Confidential Semiconductor Manufacturing Client
Bulk HCL Building
Confidential
Austin, TX
No data was found
No data was found