JE Dunn completed the 18,200 SF remodel and tenant finish of an existing muffler shop, as well as an addition of two pre-engineered metal buildings with a structural steel canopy/shelter. The new facility is home to a learning lab that houses skills-based resources including a student co-working facility, digital media lab, makerspace, an automotive and engineering lab, and an on-site food truck run by culinary arts students.
Operation Breakthrough
Owner/Client
Clockwork
Architect
Kansas City, Missouri
Location
Completed
Status
18,200
Square Feet
2
Pre-Engineered Metal Buildings
200
Students
Gallery
2019
Trinity High School
2021
Kansas City Kansas Public Schools
2019
Willard South Intermediate School
2027
University of Minnesota Community-University Health Care Center