Operation Breakthrough Ignition Lab

Project Highlights

JE Dunn completed the 18,200 SF remodel and tenant finish of an existing muffler shop, as well as an addition of two pre-engineered metal buildings with a structural steel canopy/shelter. The new facility is home to a learning lab that houses skills-based resources including a student co-working facility, digital media lab, makerspace, an automotive and engineering lab, and an on-site food truck run by culinary arts students.

Operation Breakthrough
Owner/Client
Clockwork
Architect
Kansas City, Missouri
Location
Completed
Status
18,200
Square Feet
2
Pre-Engineered Metal Buildings
200
Students

Gallery

2014
Robertson Life Sciences Building and Skourtes Tower
2024
Williston Basin and Del Easton Alternative High School
2023
Emory University Health Sciences
2021
Valley City State University

Subscribe Now

Fill out the form to receive The Look Ahead, JE Dunn’s quarterly economic report.

No data was found
No data was found