Confidential Semiconductor Manufacturing Client

Master Plan

In a partnership with Mazzetti and BurkettEUA, JE Dunn has been providing design/build services to expand this client’s advanced manufacturing production capacity in Northern Colorado. Our first project on the campus included the fast-track conversion of office space to clean room wafer manufacturing with 4,700 square feet of ISO Class 6 clean room space, supported by 3,225 square feet of chase space, designed to meet ISO Class 7 standards. Phase two of the master plan included a large building expansion comprised of a 193,372 square foot Core and Shell addition to an existing building. The Core and Shell was built out with 43,000 square feet of clean room fabrication space. The building is designed to accommodate a build out of ISO Class 6 in an open “ballroom” configuration and as an H-5 occupancy, with H-2 and F-1 accessory uses. The expansion's Central Utility Building houses the chiller room, the electrical room with mechanical mezzanine above, and the UPW room. The expansion also includes a Gas Bay as a single-story area, H-2 occupancy, on the south side of the building, which houses a generator room, gas bay room and receiving area for the loading dock.

During the TI project, a silane storage area was constructed in this area. The gas bay also provides connection to the building's silane storage pad, located directly south of the facility. The Fab Level (53,590 gross square feet) consists of 35,000 square feet of clean room. The Fan Attic (53,590 gross square feet) is comprised of steel structure and catwalk providing free access to all mechanical equipment installed to support the interior clean room construction. Upon completion of the building expansion, we delivered an additional new facility which consists of 141,644 square feet of warehouse, testing and office space. This phase houses office space to accommodate 200+ employees and includes 20,000 square foot of ISO-6/ISO-7 cleanroom space including an expansion of the campus’ parking capacity.

Location
Fort Collins, CO
Client
Confidential Client
Architect
Mazzetti / BurkettEUA
Completion Date
November 2016

Related Content

Projects
Industrial & Manufacturing
Portland
Oregon Liquor and Cannabis Commission (OLCC)
Distilled Spirits Distribution Center
Oregon Liquor and Cannabis Commission
Canby, OR
Projects
Industrial & Manufacturing
Nashville
LG Chem Cathode Manufacturing Plant Phase 1
The Largest Foreign Direct Investment in Tennessee's History
LG Chem
Clarksville, TN
Projects
Advanced Industries Industrial & Manufacturing
Santa Clara
Confidential Client Systems Upgrade & Expansion Progressive Build Program
Confidential Client
Fremont, CA
Projects
Industrial & Manufacturing
Denver
Confidential Electronics Manufacturing Client Facility
Restructure and Expansion
Confidential Client
Confidential
Thought Leadership
Industrial & Manufacturing
Eight Proactive Practices to Ensure Success Working with Foreign Clients in U.S. Manufacturing Construction
Drew Overmiller
Vice President
Director of Engineering
February 2025
Publication
Advanced Industries Industrial & Manufacturing Mission Critical
The Look Ahead: Advanced Facilities Group
February 2025
Thought Leadership
Advanced Industries Industrial & Manufacturing Mission Critical
Four Drivers to Increase Speed to Market in Semiconductor, Other Advanced Manufacturing
Tom Heger
Group Manager 2
Advanced Industries
January 2025
Projects
Advanced Industries Industrial & Manufacturing
Portland
Confidential Semiconductor Manufacturing Client
Progressive Build Projects
Confidential
Hillsboro, OR
Thought Leadership
Advanced Industries Healthcare Mission Critical Multi-Family, Student Housing & Senior Living
South Central Region
Mega Project Building Tips from JE Dunn Experts
November 2024
Thought Leadership
Advanced Industries Industrial & Manufacturing Mission Critical
How JE Dunn's Advanced Facilities Group Changes the Game
Paul Neidlein
Advanced Facilities Group President
October 2024
No data was found
No data was found