KC Current Stadium at Berkley Riverfront Park

The first stadium built exclusively for a women’s professional sports team, the project is full of women making history.
Kansas State University Morgan Family Arena and Morris Family Olympic Training Center

JE Dunn completed the state-of-the-art Morgan Family Arena and Morris Family Olympic Training Center after successfully completing the Kansas State Bill Snyder Family Stadium Shamrock Zone. MORGAN FAMILY ARENAÂ New climate controlled, purpose built arena for K-State volleyball, which includes 3,100 fixed seats. The unique seating bowl is constructed of a steel sandwich plate system […]
Hillyard Distribution Center

Hillyard, Inc. is a 100+-year-old chemical company. JE Dunn served as design-builder for a new, 141,000 SF, 20-dock position distribution center adjacent to Hillyard’s headquarters in downtown St. Joseph, MO. Site work was extensive, including nearly two months of remediation of unforeseen conditions following demolition of the existing structure on the site. The slab on […]
Historic Kansas State Capitol

JE Dunn Construction was hired to preserve and restore the historic Kansas Statehouse located in the heart of Topeka. The project was designed as a 10-year, 6-phase project, which allowed for staggered completion dates of the interior restoration of the east, west, north, and south wings. Much of the interior space was restored to its […]
Richard Bolling Federal Building

The Richard Bolling Federal Building was built in 1965 and is a 21-story building located in downtown Kansas City. Over the course of 12 years, JE Dunn led the construction of the 4-phase occupied office renovation, exterior retrofit, and new plaza entries. Renovations included the complete renovation of all 21 floors, including asbestos and lead […]
Oracle Cerner Innovations Campus

JE Dunn provided construction services for one of the largest economic development projects in Missouri’s history. The Oracle Cerner Innovations Campus sits on a 293-acre greenfield site. Phase 1 and 2 consist of site development, two office buildings, and a 125,000 SF service center. The first building is an 860,000 SF, 11-story office tower served […]
Dan & Cassidy Towriss IDEA Space

JE Dunn recently completed the new Dan & Cassidy Towriss IDEA Space KC for The Barstow School. The reclaimed grocery store was turned into a world-class learning facility with four key areas; Makerspace, Technology Lab, Fabrication Workshop and Incubation Hub. Each space will have cutting edge tools and technology where students learn to solve problems […]
Rockhurst University Sedgwick Hall

JE Dunn completed an 80,000 SF renovation to the existing Sedgwick Hall. Majority of existing structure and envelope was repurposed, while the new addition is a steel structure with metal panel and glass envelope. Existing roof was demolished and replaced with new mod-bit system. Interior was finished out to include classrooms, nursing labs, simulation rooms, […]
LightEdge Data Center

For the past decade, JE Dunn has provided construction services for Cavern Technologies – recently acquired by LightEdge – located in the Meritex caves in Lenexa, Kansas. Projects include both the initial construction of data center space and facility expansions. In 2016, we completed Phase 4A Day Two Space including 16,000 SF of whitespace with […]
U.S. Army Corps of Engineers Medical MATOC Program

JE Dunn has been in a Design-Build Initial Outfitting (DBIO) Medical MATOC with the U.S. Army Corps of Engineers Little Rock District since 2009, designing and constructing medical facilities at military installations throughout the United States. This experience helps us to understand specific missions at each installation regarding healthcare delivery and has given us the […]