This $23+ million, 51,202 SF project supports Houston Airports and provides space to house operations such as shuttle bus maintenance, fleet maintenance, and airside operations.
JE Dunn and Martinez Architects partnered on the construction of the facility, utilizing existing pre-engineered structural material to redesign the new facility which includes warehouse and office space, loading docks, a covered exterior work area and mechanical yard. A main feature of the project includes massive bay doors to load in the airport’s largest fleet vehicles for service. Each of the large bays features vehicle lifting systems able to lift 100+ tons, and overhead equipment for easy access and maintenance. The project also included extensive sitework, vehicle storage yard, remote detention and modification to a stormwater outfall on the “air side” of the airport.