Confidential Semiconductor Client

Lab Renovation

Project Highlights

This project renovated an existing 10,000 square-foot semiconductor processing cleanroom space for a new research and design and prototyping facility.

The renovation involved the installation of 18 specialized process and utility equipment, including a new process cooling water unit, hydrogen and oxygen tanks, evaporators, data output systems, an acid scrubber, as well as associated ductwork, piping, and conduit. The scope also included upgrades to life-safety systems and fire protection infrastructure.

The completed development and prototyping facility provides a collaborative space for faculty and students to work with new 300mm tools, the same equipment used in a production fab. This supports the Valley’s growing semiconductor network.

Confidential Client
Owner/Client
Diamondback Design Group
Architect
Tempe, AZ
Location
Completed
Status
CM @ Risk
10,000
Square-feet
300mm
Equipment Installed

Gallery

2022
Confidential Semiconductor Manufacturing Client
2022
Confidential Industrial Manufacturing Company Conveyance Bridge
2026
Confidential Semiconductor Client
2022
Confidential Semiconductor Client
No data was found
No data was found