Confidential Data Center Project – Bronco Filly

Project Highlights

This 250,000 square foot, 48-megawatt data center is the initial phase of a multi-building data center campus. JE Dunn is delivering the complete buildout of the first building, including an Administrative Space and 5 Colos, with each consisting of multiple data halls designed to house server infrastructure. The mass excavation scope included over 1 million cubic yards of soil moved with some areas being cut over 20 feet and filled in others nearly 30 feet to ready the building pads.

The single-story facility will feature an air-cooled system and a full interior fit-out with owner-furnished equipment. This Mission Critical project is being constructed using a pre-engineered metal building system, supporting an efficient and scalable approach to meet speed-to-market demands.

Confidential Client
Owner/Client
Burns & McDonnell
Architect
Cheyenne, WY
Location
In Progress
Status
250,000
Square-feet
48 MW
Full Build Out
5 colos

Gallery

2019
Stream Data Center DFW VII
2022
Digital Realty
2026
Meta Temple Data Center
2028
Confidential Data Center Project - Bronco Filly

Subscribe Now

Fill out the form to receive The Look Ahead, JE Dunn’s quarterly economic report.

No data was found
No data was found