The University of Kansas Health System Cambridge Tower

Project Highlights

In 2018, JE Dunn completed the 577,000 SF, 14-story, new patient tower, which includes 11 operating rooms, three levels of patient beds, and a two-level connecting bridge.

Then in 2021, JE Dunn completed the 109,000 SF Cancer Center on levels 8, 9 and 10 of Cambridge Tower. The Cancer Center has 100 protected beds and is now an innovative and unified space that encompasses all the care and needs of BMT, Leukemia and HMCT patients, their families and care teams.

The University of Kansas Health System
Owner/Client
CannonDesign
Architect
Kansas City, Kansas
Location
Completed
Status
577,000
Square Feet
14
Floors

Gallery

2024
Tampa General Hospital
2023
Ascension Seton Dell Children’s North Hospital and Medical Office Building
2024
Tucson Medical Center Rincon Hospital
2021
Dr. Vince Clinical Research Facility
No data was found
No data was found