Confidential Semiconductor Manufacturing Client

Link for Automated Material Handling System (AMHS)

Project Highlights

  • This project included a 50,000-square-foot elevated, multi-level cleanroom link that connected three existing fabrication facilities together.
  • JE Dunn worked closely with the facility system owners to coordinate construction activities and keep their highly sensitive microchip fabrication facilities operational 24/7. All new utilities were successfully installed with zero impacts.
  • Prefabrication equated to labor savings of $1.4M and 24 weeks in time savings.
  • The team developed and proposed 103 value options during the programming/design phase. JE Dunn proposed $36M in savings and the client accepted $23M. Equipment procurement saved $3.5M through direct purchasing and introduction of alternate suppliers.
Confidential
Owner/Client
SSOE Group
Architect
Hillsboro, Oregon
Location
December 2015
Completion Year