Confidential Semiconductor Manufacturing Client

Ground-Up Fab and Phased Renovations

Project Highlights

JE Dunn JE Dunn provided phased construction services to expand a confidential client’s advanced manufacturing production capacity.

Building 2: Fast-track conversion of office space to cleanroom wafer manufacturing with 4,700 square feet of ISO Class 6 clean room space, supported by 3,225 square feet of chase space, designed to meet ISO Class 7 standards.

Building 3: 141,644-square-foot warehouse, testing and office facility equipped to accommodate 200+ employees. The facility includes 20,000 square feet of ISO-6/ISO-7 clean room space.

Building 4: 193,000-square-foot core and shell addition to an existing building built out with 43,000 square feet of clean room fabrication space. The building is designed to accommodate a build out of ISO-Class 6 in an open “ballroom” configuration and as an H-5 occupancy, with H-2 and F-1 accessory uses.

  • Central Utility Building: new building to house chiller room, electrical room with mechanical mezzanine above, and UPW room.
  • Gas Bay Portion: single-story area, H-2 occupancy, on the south side of the building, which houses a generator room, gas bay room and receiving area for the loading dock.
  • Fab Level: 35,000 square feet of cleanroom located in the northeast corner. The cleanroom area is designed on a cheese slab and a 24” raised access floor.
Confidential
Owner/Client
Mazzetti / BurkettEUA
Architect
Fort Collins, Colorado
Location
Completed
Status
108,000
Square-Foot Cleanroom

Gallery

2024
Confidential Semiconductor Manufacturing Client
2021
Confidential Data Center Client Bay Area Program
Confidential Semiconductor Manufacturing Client
2023
Confidential Semiconductor Tool Manufacturing Company
No data was found
No data was found