Case Study: Southeast Toyota Distributors JAXPORT

Serving the Southeast: Scaling Automotive Throughput with a Purpose-Built Campus As Southeast Toyota Distributors expanded its vehicle processing operations across the Southeast, JE Dunn partnered with the owner and the Jacksonville Port Authority to deliver a centralized, high-capacity campus capable of supporting increased volumes, tighter logistics demands, and evolving vehicle technologies. Serving as construction manager […]
Georgia State Bell Building Renovation Preserves History for Student Success

Bell Building Renovation: Historic Adaptive Reuse at Georgia State University Georgia State University’s (GSU) Bell Building, a historic former Southern Bell telephone building dating back to the early 20th century, sat vacant for 30 years. Initially slated for demolition, GSU chose instead to renovate the landmark into a centralized hub for student support services after […]
Oregon Liquor and Cannabis Commission (OLCC) Distilled Spirits Distribution Center Case Study

OLCC Distilled Spirits Distribution Project Overview The Oregon Liquor and Cannabis Commission (OLCC) partnered with JE Dunn Construction, LRS Architects, and Cumming Group to deliver a new 347,645 square foot Distilled Spirits Distribution Center in Canby, Oregon. The purpose-built facility modernizes the state’s liquor supply chain, doubling distribution capacity and integrating advanced material-handling automation to […]
Future-Proofing Healthcare Infrastructure: A Smart Approach to Central Utility Design

Many health systems today are grappling with strained facilities, aging infrastructure, tight capital environments, and increasing pressure to support growing patient volumes, all while keeping critical operations reliable. These converging forces make it essential to rethink central utility design with an eye toward long-term performance and adaptability. Driving Certainty In Mission-Critical Environments In the last […]
Maximizing Efficiency Through Unique Prefabrication Efforts

JE Dunn’s approach to prefabrication integration aims to collaboratively optimize the design, streamline scheduling, enhance safety, and maximize resource efficiency. JE Dunn recently worked to implement a complex prefabrication integration for the Starlight Theatre project, a renowned Kansas City landmark. Starlight Theatre recently launched their Uniquely KC campaign to raise money for their new renovation […]
What It Takes to Be The First

CPKC Stadium is the first sports facility in the world purpose-built for a women’s professional team. Combining industry innovation with sustainable solutions and local flair is what changes the game for this one-of-a-kind build along the Missouri riverfront.
Colorado State University Spur Campus at the National Western Center

The project included the construction of three buildings, all pursuing LEED Gold, adjacent to one another, under three separate contracts. JE Dunn constructed all three buildings concurrently, but each in a different phase of construction from its neighbor.
National Cowboy and Western Heritage Museum Liichkoshkomo Outdoor Exhibit

National Cowboy and Western Heritage Museum Liichkoshkomo Outdoor Exhibit Case Study 3 “The JE Dunn approach to working with the owner and architect is that we are all a team; we’re in this together. I never ever heard anyone say to me, “You have a problem.” It was always, “We have an issue we need […]
University of Oklahoma Cross Village

The Benefits Fast-tracked the design phase to start construction in phases – just four months after the start of design work 16-month schedule was achieved, including a $14 million scope that was added 8 months into the project and needed to coincide with the original schedule “I have had experiences in the past where, as […]
Restoring the Oklahoma State Capitol

The Benefits Zero Change Orders issued during the first three years of this five-year project Major design changes due to unforeseen conditions resulted in $0 cost to the owner (ie. early revamp of stone cleaning and window removal process) “Time after time, when unknown conditions were encountered, the construction team and architects, in partnership with […]