Confidential Semiconductor Manufacturing Client Master Plan

In a partnership with Mazzetti and BurkettEUA, JE Dunn has been providing design/build services to expand this client’s advanced manufacturing production capacity in Northern Colorado. Our first project on the campus included the fast-track conversion of office space to clean room wafer manufacturing with 4,700 square feet of ISO Class 6 clean room space, supported by 3,225 square feet of chase space, designed to meet ISO Class 7 standards. Phase two of the master plan included a large building expansion comprised of a 193,372 square foot Core and Shell addition to an existing building. The Core and Shell was built out with 43,000 square feet of clean room fabrication space. The building is designed to accommodate a build out of ISO Class 6 in an open “ballroom” configuration and as an H-5 occupancy, with H-2 and F-1 accessory uses. The expansion's Central Utility Building houses the chiller room, the electrical room with mechanical mezzanine above, and the UPW room. The expansion also includes a Gas Bay as a single-story area, H-2 occupancy, on the south side of the building, which houses a generator room, gas bay room and receiving area for the loading dock.

During the TI project, a silane storage area was constructed in this area. The gas bay also provides connection to the building's silane storage pad, located directly south of the facility. The Fab Level (53,590 gross square feet) consists of 35,000 square feet of clean room. The Fan Attic (53,590 gross square feet) is comprised of steel structure and catwalk providing free access to all mechanical equipment installed to support the interior clean room construction. Upon completion of the building expansion, we delivered an additional new facility which consists of 141,644 square feet of warehouse, testing and office space. This phase houses office space to accommodate 200+ employees and includes 20,000 square foot of ISO-6/ISO-7 cleanroom space including an expansion of the campus’ parking capacity.

Location
Fort Collins, CO
Client
Confidential Client
Architect
Mazzetti / BurkettEUA
Completion Date
November 2016

Related Content

Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Systems Upgrade & Expansion Progressive Build Program
Confidential Client
Fremont, CA
Projects
Advanced Industries
Portland
Confidential Semiconductor Manufacturing Client
Progressive Build Projects
Confidential
Hillsboro, OR
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Cleanroom
Confidential Client
Fremont, CA
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Data Center Project
Confidential Client
Santa Clara, CA
Thought Leadership
Advanced Industries
The CHIPS Act – Establishing a Contractor’s Role
Travis Noble
Vice President
Project Executive
August 2023
Projects
Advanced Industries Mission Critical
Santa Clara
SLAC National Accelerator Laboratory Bay Area Program
SLAC National Accelerator Laboratory
Menlo Park, CA
Projects
Advanced Industries
Portland
Confidential Semiconductor Client
Fab Cleanroom Expansion & CUP Upgrades – Boise
Confidential
Boise, ID
Projects
Advanced Industries
Austin
Confidential Semiconductor Manufacturing Client
Bulk HCL Building
Confidential
Austin, TX
Publication
Advanced Industries
The Look Ahead: Labor Shortage
August 2022
Thought Leadership
Design
Advanced Industries
Closing The Loop: Integrating Design & Construction In Semiconductor Manufacturing
Trent Wachsnicht
Chief Operating Officer
March 2022
No data was found
No data was found