Confidential Data Center Substation

Project Highlights

Second substation on a data center campus. Two 138kV circuits feeding group operated air break (GOAB) switch mounted on A-frame dead-end structures. 2000A 138kV high voltage circuit breakers feeding two owner-furnished 150MVA, 138/24.9kV Siemens transformers. Overhead distribution to (4) 3000A MDC buildings each with (4) 1200A, 15kV feeder breakers connected to an outdoor control enclosure with SEL Relays.

Confidential
Owner/Client
Confidential
Architect
Dallas Fort Worth Metro
Location
Completed
Status
2022
Confidential Semiconductor Manufacturing Client
2024
Confidential Data Center Substation
2023
NAPA Auto Parts Balkamp Distribution Center Expansion
2014
Kansas Dairy Ingredients Processing Plant

Subscribe Now

Fill out the form to receive The Look Ahead, JE Dunn’s quarterly economic report.

No data was found
No data was found