JE Dunn was the Design-Build contractor for the Lab and Administration Building portion of a state-of-the-art biotech manufacturing campus.
This project involved constructing an approximately 145,000-square-foot, three-story Lab and Administration Building on a multi-building campus. The campus includes four drug substance buildings, a drug product building, and a central utility building (CUB). All structures are interconnected by a central spine, facilitating the movement of materials, people, and utilities.
This project is pursuing LEED Gold certification.
Confidential
Owner/Client
Confidential
Architect
Confidential
Location
Completed
Status
145,000+
Square Feet
3
Stories
Gallery
2025
Confidential Biopharma Laboratory and Administration Building
2018
Colorado State University C. Wayne McIlwraith Translational Medicine Institute
2012
National Laboratory of the Rockies ESIF
2024
University of Minnesota Dwan Levels 2 and 3 Wet Bench Lab Renovations