Confidential Biopharma cGMP Warehouse

Project Highlights

JE Dunn was the contractor for a confidential biopharmaceutical client’s Design-Build state-of-the-art cGMP warehouse, totaling over 200,000 square feet. This facility serves a multifaceted function, supporting Drug Substance Manufacturing (DSM) and Drug Product and Finished Goods (DPFG) operations.

The cGMP Warehouse is designed to accommodate a variety of critical functions. It includes receiving, storage, sampling, drug substance freezing, cold storage, material dispensing, tote and parts washing, water for injection (WFI) generation, and personnel support. The primary storage areas are equipped with racking for sections dedicated to ambient storage, ambient flammable storage, and multiple types of cold storage, maintaining temperatures ranging from 2 to -70 degrees Celsius.

The project is pursuing LEED Gold Certification under LEEDv4.

Confidential
Owner/Client
Confidential
Architect
Confidential
Location
Completed
Status
200,000+
Square Feet

Gallery

2024
Confidential Biopharma cGMP Warehouse
2016
University of Colorado Boulder Sustainability Energy and Environment Complex (SEEC)
2025
Confidential Biopharma Laboratory and Administration Building
2021
University of Colorado Anschutz Medical Campus

Subscribe Now

Fill out the form to receive The Look Ahead, JE Dunn’s quarterly economic report.

No data was found
No data was found