NAPA Auto Parts Balkamp Distribution Center Expansion

Project Highlights

This 282,500 square foot distribution facility is located on 13 acres directly adjacent to NAPA Balkamp’s existing facility. The new facility will tie into the existing warehouse, creating a larger building to meet increased demand. These tie-ins were highly coordinated, as they included several punch-through aisles and pass-throughs of the existing conveyor system. JE Dunn worked extensively with NAPA to ensure ongoing distribution operations continued undisturbed throughout construction.

This tilt-up facility is 54 feet tall and includes a significant amount of new material handling equipment and systems to automate NAPA’s pick-pack-ship modules. Upgrades to the sprinkler system across the existing building were also included, along with a new generator and a small customer support area with offices and restrooms. Within the existing facility, JE Dunn ensured the roof was sufficiently supported with snow loads and re-work approximately 75,000 square feet of seven-inch concrete slab to a floor flatness of F100.

Genuine Parts Company
Owner/Client
Randall-Paulson Architects
Architect
Plainfield, Indiana
Location
December 2023
Completion Year
55+ Feet
Height of Tilt Panels
12 Inches
Slab Thickness
4
Different Automation Systems