Vertical Transportation Replacement Logistics and Coordination at Hartsfield-Jackson Atlanta International Airport

The Vertical Transportation Replacement Logistics and Coordination project was a three-year program that included logistical and hoisting support for KONE as they upgraded moving sidewalks and elevators at Hartsfield-Jackson Atlanta International Airport. The entirety of JE Dunn’s scope for this project was ensuring interior maintenance of traffic and secure overhead and interior readiness after each night’s work completed. As part of the project, JE Dunn supported KONE by building temporary partitions around work areas, as well as temporary storage areas to house components and debris staging. JE Dunn removed all debris from the location of the work, in addition to providing hoisting support for all of KONE's equipment, including removing the access hatch, coordinating nightly set-up and break-down of a crane. JE Dunn also provided directional signage to ensure minimal passenger confusion during construction.