The University of Arizona, Arizona Stadium

JE Dunn was selected as the contractor for the Design-Build team for the Arizona Stadium renovation. Our team created a feasibility study that evaluated the cost and impact of renovating the East, West and South sides of the stadium.

Multiple options and phases were studied to improve the stadiums infrastructure, safety and code upgrades, circulation improvements, restrooms, concessions and fan amenities.

Our team provided design and construction of the East Sideline Renovation, which needed to be complete for the 2018 Football Season. Due to the aggressive nature of the schedule, our team worked with the University to procure critical path trade partners through the “Best Value Selection” method to ensure assistance during the design phase and confidence in the budgets.

The renovation included demolition of the existing East sideline concourse, a new 48” storm line to run below the concourse, new slab-on-grade, restrooms, concessions, recruiting lounge, re-seating of the East lower bowl (ZonaZoo), storage and back-of-house areas for the University to use year round.