JE Dunn completed construction on a 138,000 SF, 4-story patient tower expansion for Medical City Plano, a fully occupied hospital.  This project includes 60 new medical/surgery beds, 30 burn and trauma ICU beds, oncology, associated nurse stations and support spaces, lobby reception and admitting, café, gift shop and office space. Also included in this project is an expanded 12,000 SF utility plant including chillers, power generators, MDF electrical room and storage. This project will be LEED certified once completed.

In response to a challenge from the owner, HCA Healthcare, the multi-disciplinary project team (owner, designer, contractor and trade partners) has been piloting and measuring efforts to simultaneously reduce on-site labor, project duration and cost while maximizing opportunities for prefabrication. The team’s efforts have dramatically impacted project outcomes and helped to shape best practices for future projects.

JE Dunn, the design team, the owner, and key trade partners prefabricated 60% of the building off-site. These efforts not only resulted in a 12% cost and 10% schedule savings, but also maximized quality and mitigated trade shortages in the local market.