The new Delta Air Lines Ground Support Equipment (GSE) shop at Hartsfield-Jackson Atlanta International Airport is an enabling project for the expansion of Concourse T. The original GSE Building was located in the path of the expansion.
The new facility is 29,000 SF and sits on a 2.7 acre site along the South Terminal Parkway. The GSE shop allows for fueling, repairs and cleaning of the tugs, baggage carts, service trucks, and other equipment that provide ground support to Delta’s aircraft in Atlanta. Elements of the project include fueling stations, triturator and a wash rack, along with the shop building that contains garage bays for equipment maintenance. The fueling area includes two fuel islands with unleaded gasoline, diesel fuel and diesel exhaust fluid.
JE Dunn worked closely with the City of Atlanta Department of Aviation, Delta Air Lines and multiple other stakeholders throughout construction to ensure zero disturbance to ongoing operations while ensuring site security and separation. This project was transitioned to the secure identification display area (SIDA), so coordination with DOA Security and TSA was paramount.